Postal Address Street Address (map) Phone / Fax Contact
Case Postale 88
CH-1015 Lausanne
Office GC A2 424 at the Swiss
Federal Institute of Technology Lausanne (EPFL)
phone +41 21 693 2747
fax +41 21 693 6245


Commissions, Task Groups and Special Activity Groups

At present, the following Commissions, Task Groups and Special Activity Groups are active.
Their Working Programmes and Membership are available as PDF files by clicking on the appropriate place as indicated under each commission or SAG.

 CommissionsChair / Co-chair
   Task Groups 
 Working Programme pdf-file 
  
 C 1 StructuresG. Clark / J.-F. Klein
   T 1.1 Design applications  João Almeida
   T 1.2 Bridges  Jean-François Klein
 WPC1_18Dec06.pdf 

 Commission 1 report from the fib Congress, Naples, June 2006
 (PDF file, 24.8 MB)
 
  
 C 2 Safety and performance conceptsL. Taerwe / K. Bergmeister
 WPC2_18Dec06.pdf 

 Commission 2 report from the fib Congress, Naples, June 2006
 (PDF file, 112 KB)
 
  
 C 3 Environmental aspects of design and constructionK. Sakai / M. Schmidt
   T 3.5 Protective concrete structures  Klaas Van Breugel
   T 3.6 Guidelines for environmental design  Koji Sakai
   T 3.7 Integrated life cycle assessment of concrete structures  Petr Hajek
   T 3.8 Green concrete technologies for life-cycle design of
             concrete structures
  Mette Glavind
   T 3.9 Application of environmental design to concrete structures  Kenji Kawai
 WPC3_18Dec06.pdf 

 Commission 3 report from the fib Congress, Naples, June 2006
 (PDF file, 424 KB)
 
  
 C 4 Modelling of structural behaviour and designS. Foster / F. Vecchio
   T 4.1 Serviceability models  György Balázs
   T 4.2 Ultimate limit state models  Viktor Sigrist
   T 4.3 Fire design of concrete structures  Niels Peter Hoej
   T 4.4 Computer based modelling and design  Koichi Maekawa
   T 4.5 Bond models  John Cairns
 WPC4_18Dec06.pdf 
  
 C 5 Structural service life aspectsS. Matthews / S. Rostam
   T 5.3 Assessment, maintenance and rehabilitation  Stuart Matthews
   T 5.7 Service life design guide  Steen Rostam
 WPC5_18Dec06.pdf 

 Commission 5 report from the fib Congress, Naples, June 2006
 (PDF file, 6.7 MB)
 
  
 C 6 PrefabricationM. Menegotto / D. Fernandez
   T 6.1 Prestressed hollow core floors  Aad Van Paassen
   T 6.2 Connections  Björn Engström
   T 6.6 New Model Code - Precast Concrete  Marco Menegotto
   T 6.7 Affordable housing  David Fernandez-Ordonez
   T 6.8 Treatment of imperfections in precast concrete members  José Calavera
   T 6.9 Design of precast concrete structures for accidental loading  Arnold Van Acker
   T 6.10 Design provisions for precast concrete structures in
             moderate seismic areas
  Spyros Tsoukantas
 WPC6_18Dec06.pdf 

 Commission 6 report from the fib Congress, Naples, June 2006
 (PDF file, 30.8 MB)
 
  
 C 7 Seismic designM. Fardis / P.E. Pinto
   T 7.4 Seismic design and assessment procedures for bridges  G.-M. Calvi / K. Kawashima
   T 7.5 Seismic design of buildings incorporating high
             performance materials
  F. Watanabe, S. Pampanin
   T 7.6 Critical comparison of major seismic design codes
             for buildings
  H. Tanaka, F. Watanabe
 WPC7_18Dec06.pdf 

 Commission 7 report from the fib Congress, Naples, June 2006
 (PDF file, 5 MB)
 
  
 C 8 ConcreteF. Dehn / H. Müller
   T 8.2 Constitutive laws for high strength / high performance
             concrete
  Harald Müller
   T 8.3 Fibre reinforced concrete  Lucie Vandewalle
   T 8.5 Silica fume in concrete  Mette Geiker
   T 8.6 Ultra High Performance Fibre Reinforced Concrete (UHP FRC)  Joost Walraven
   T 8.7 Green concrete  Harald Müller
 WPC8_18Dec06.pdf 

 Commission 8 report from the fib Congress, Naples, June 2006
 (PDF file, 1.3 MB)
 
  
 C 9 Reinforcing and prestressing materials and systemsJ. Bastien / T. Neff
   T 9.3 FRP reinforcement for concrete structures  Luc Taerwe
   T 9.5 Durability of prestressing materials  Manuel Elices
   T 9.7 Reinforcing steels and systems  Ben Bowsher
   T 9.9 Manual for prestressing materials and systems  Josée Bastien / Alain Chabert
   T 9.11 Testing the bond capacity of tendon anchorages  Jaime Galvez Ruiz
   T 9.12 Ground anchors  Toshihiko Niki
   T 9.13 External tendons for bridges  Teddy Theryo
 WPC9_18Dec06.pdf 

 Commission 9 report from the fib Congress, Naples, June 2006
 (PDF file, 4 MB)
 
  
 C 10 ConstructionA. van der Horst / P. Jacquet
   T 10.1 Curing of concrete   Per E.F. Jensen
   T 10.2 Formwork and falsework  Philippe Jacquet
   T 10.5 Lifecycle management  Aad van der Horst
 WPC10_18Dec06.pdf 

 Commission 10 report from the fib Congress, Naples, June 2006
 (PDF file, 3.2 MB)
 
  
 SAG 2 Dissemination of knowledgeG. Balázs
 WPSAG2_18Dec06.pdf 

 SAG 2 report from the fib Congress, Naples, June 2006
 (PDF file, 19.6 MB)
 
  
 SAG 4 Fastenings to structural concrete and masonryR. Eligehausen
 WPSAG4_16Feb07.pdf 

 SAG 4 report from the fib Congress, Naples, June 2006
 (PDF file, 1.7 MB)
 
  
 SAG 5 New Model CodeJ. Walraven
 WPSAG5_18Dec06.pdf 

 SAG 5 report from the fib Congress, Naples, June 2006
 (PDF file, 13 MB)
 

Further internal reports, unpublished working documents, or links to internal websites of Comissions, Task Groups or Special Activity Groups are available to fib-members only via membership services.

If interested to participate in the work of certain Task Groups, an Applicant Data Sheet (download here) should be filled in and send to the secretariat. Note: Participants in the work of Task Groups or Commissions have not automatically membership status in fib. The Assignment conditions for Participation in Commissions and Task Groups apply (download here).

Top