• fib network

    fib Network

  • fib network

    fib Network

  • fib network

    fib Network

  • fib network

    fib Network

Notice

This is a closed group. You will have to be a member of this group to view the group's content.

WP2.3.3 - Fire resistance of concrete tunnels

WP2.3.3 - Fire resistance of concrete tunnels

 
  • The aim of WP2.3.3 is to prepare a technical report concerning structural engineering aspects of fire in tunnels. The main topics to be discussed are the design of concrete tunnels exposed to fire, fire scenario for different tunnels, material for concrete tunnels and design supported by testing.

  • Category
    Working parties
  • Created
    Tuesday, 30 May 2017
  • Group admin
    Meda, Alberto, fib International

fib postal address

Case postale 88
CH-1015 Lausanne
Switzerland

Contact

p : +41 21 693 27 47
f : +41 21 693 62 45
e : info@fib-international.org
w : www.fib-international.org

Follow fib

Subscribe our newsletter

 Follow us on
        

Join the fib

Join the fib