• fib network

    fib Network

  • fib network

    fib Network

  • fib network

    fib Network

  • fib network

    fib Network

Notice

This is a closed group. You will have to be a member of this group to view the group's content.

TG3.3 - Assessment /evaluation and decision-making procedures for the through-life management of existing concrete structures

TG3.3 - Assessment /evaluation and decision-making...

 
  • Task Group 3.3 focuses on the development of a set of practical state-of-the-art guidelines for the assessment and decision-making procedures required for the through-life management of existing concrete structures, focusing on:

    • advanced assessment techniques for the evaluation of existing structures, both in their current condition and taking account of time-dependent changes which may occur to them;
    • simplified assessment approaches for such kind of evaluations;
    • the development of practical decision-making procedures to perform a complete and coherent assessment of an existing structure.

    The initial focus will be on the preparation of technical guidelines for the characterisation of deterioration mechanisms and of suitable prognosis methods that are feasible for practical engineering purposes. At the same time, technical guidelines will also be developed in order to clarify tools and techniques for surveys and monitoring of the addressed deterioration mechanisms.

  • Category
    Task groups
  • Created
    Wednesday, 31 May 2017
  • Group admin
    fib International, Strauss, Alfred

fib postal address

Case postale 88
CH-1015 Lausanne
Switzerland

Contact

p : +41 21 693 27 47
f : +41 21 693 62 45
e : info@fib-international.org
w : www.fib-international.org

Follow fib

Subscribe our newsletter

 Follow us on
        

Join the fib

Join the fib